[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"bootstrap-es":3,"layouts-default-es":69,"content-drilling-mud-tank-es":155,"contents-{\"type\":\"product\",\"size\":5,\"locale\":\"es\"}":167},{"site":4,"menus":38},{"id":5,"code":6,"name":7,"defaultLocale":8,"theme":6,"logo":9,"favicon":10,"seoTitle":11,"seoKeywords":12,"seoDescription":13,"settings":14,"locales":16},1,"oil-equipment","SENNUO","en","\u002Fuploads\u002F1\u002F2026\u002F10\u002F37682e96bbd24875aa56e1ffe13657b9.png","\u002Fuploads\u002F1\u002F2026\u002F10\u002Fbef8f51ea219426cbdb8b2e67d0d219b.png","API 6A Wellhead & Oilfield Equipment Manufacturer","API 6A wellhead, christmas tree equipment, BOP blowout preventer, mud gate valve, high pressure plug valve, pup joint, drilling rig manufacturer, oilfield equipment supplier","API 6A \u002F 16A monogrammed wellheads, BOPs, manifolds & drilling equipment, factory-direct to 60+ countries. Get a quote — engineers reply in 24 hours.",{"ogImage":15},"\u002Fuploads\u002F1\u002F2026\u002F10\u002Fb4cc9aadd8ae42ffbd5fa76044942b3f.jpg",[17,22,26,30,34],{"locale":8,"urlPrefix":18,"name":19,"nativeName":19,"isDefault":20,"isRtl":21},"\u002F","English",true,false,{"locale":23,"urlPrefix":23,"name":24,"nativeName":25,"isDefault":21,"isRtl":21},"ru","Russian","Русский",{"locale":27,"urlPrefix":27,"name":28,"nativeName":29,"isDefault":21,"isRtl":21},"es","Spanish","Español",{"locale":31,"urlPrefix":31,"name":32,"nativeName":33,"isDefault":21,"isRtl":20},"ar","Arabic","العربية",{"locale":35,"urlPrefix":35,"name":36,"nativeName":37,"isDefault":21,"isRtl":21},"zh-CN","Chinese","简体中文",{"main":39,"footer":68},[40,43,48,53,58,63],{"id":5,"title":41,"url":18,"isNewTab":21,"children":42},"Inicio",[],{"id":44,"title":45,"url":46,"isNewTab":21,"children":47},2,"Productos","\u002Fproducts",[],{"id":49,"title":50,"url":51,"isNewTab":21,"children":52},3,"Proyectos","\u002Fcases",[],{"id":54,"title":55,"url":56,"isNewTab":21,"children":57},4,"Noticias","\u002Fnews",[],{"id":59,"title":60,"url":61,"isNewTab":21,"children":62},5,"Sobre nosotros","\u002Fabout",[],{"id":64,"title":65,"url":66,"isNewTab":21,"children":67},6,"Contacto","\u002Fcontact",[],[],[70,86,139],{"id":5,"setCode":71,"code":72,"name":73,"slot":74,"sort":5,"blocks":75},"default","site_header","页头","header",[76],{"blockKey":77,"colIndex":78,"props":79,"status":5},"site_nav",0,{"sticky":20,"bgColor":80,"ctaLink":66,"ctaText":81,"showCta":20,"menuCode":84,"bgOpacity":85,"showSearch":20,"showLanguage":20,"showColorMode":20},"#0b1f33",{"en":82,"zh-CN":83},"Get a Quote","获取报价","main",80,{"id":44,"setCode":71,"code":87,"name":88,"slot":89,"sort":44,"blocks":90},"site_footer","页脚","footer",[91,133],{"blockKey":92,"colIndex":78,"props":93,"status":5,"children":94},"columns",{"columns":54},[95,101,108,119],{"blockKey":96,"colIndex":78,"props":97,"status":5},"site_brand",{"showLogo":20,"description":98,"showDescription":20},{"en":99,"zh-CN":100},"API 6A \u002F 16A wellhead, BOP and drilling equipment manufacturer, exporting to oil and gas projects in 60+ countries.","API 6A \u002F 16A 井口、防喷器与钻采装备制造商，产品出口 60 多个国家的油气项目。",{"blockKey":102,"colIndex":5,"props":103,"status":5},"menu_links",{"title":104,"layout":107,"menuCode":84},{"en":105,"zh-CN":106},"Quick Links","快速链接","list",{"blockKey":109,"colIndex":44,"props":110,"status":5},"contact",{"email":111,"phone":112,"title":113,"address":116,"showMap":21},"info@sennuo.com","+86 183-6694-0225",{"en":114,"zh-CN":115},"Contact","联系我们",{"en":117,"zh-CN":118},"Dongying City, Shandong Province, China","中国山东省东营市",{"blockKey":120,"colIndex":49,"props":121,"status":5},"social",{"items":122},[123,128],{"url":124,"icon":125,"color":126,"label":127},"https:\u002F\u002Fwa.me\u002F8618366940225","i-lucide-message-circle","#25D366","WhatsApp",{"url":129,"icon":130,"color":131,"label":132},"mailto:info@sennuo.com","i-lucide-mail","#0f4fe6","Email",{"blockKey":134,"colIndex":78,"props":135,"status":5},"copyright",{"text":136,"showIcp":20},{"en":137,"zh-CN":138},"All rights reserved. ","版权所有。",{"id":49,"setCode":71,"code":140,"name":141,"slot":142,"sort":54,"blocks":143},"site_floating","悬浮工具","floating",[144],{"blockKey":120,"colIndex":78,"props":145,"status":5},{"items":146},[147,152,153],{"url":148,"icon":149,"color":150,"label":151},"tel:+8618366940225","i-lucide-phone","#0f172a","Call us",{"url":124,"icon":125,"color":126,"label":127},{"url":129,"icon":130,"color":131,"label":154},"Email us",{"id":156,"typeCode":157,"slug":158,"title":159,"summary":159,"cover":160,"body":161,"bodyFormat":162,"publishTime":163,"seoTitle":159,"seoKeywords":164,"seoDescription":159,"data":165,"availableLocales":166},635,"product","tanque-de-lodo-de-perforacion","Tanque de lodo de perforación","\u002Fuploads\u002F1\u002F2026\u002F10\u002F7a52ad5da9894f7ea77fe059cd0caad3.png","\u003Ch2>Drilling Mud Tank for Oilfield Mud Storage, Mixing, Circulation and Solids Control\u003C\u002Fh2>\n\u003Cp>SENNUO manufactures \u003Cstrong>Drilling Mud Tank\u003C\u002Fstrong> systems for drilling fluid storage, circulation, mixing, conditioning and solids control on land and offshore oil and gas drilling rigs.\u003C\u002Fp>\n\u003Cp>Our range includes Oilfield Mud Tanks, Drilling Fluid Tanks, Active Mud Tanks, Suction Mud Tanks, Mud Mixing Tanks, Reserve Mud Tanks, Process Tanks, Slug Tanks, Pill Tanks, Skid-Mounted Mud Tanks and complete Modular Mud Tank Systems.\u003C\u002Fp>\n\u003Cp>Individual tanks typically cover \u003Cstrong>20–100 m³, approximately 126–629 bbl per tank\u003C\u002Fstrong>. Larger rigs can connect several modules to achieve the required active, reserve and process volume without creating one oversized tank.\u003C\u002Fp>\n\u003Cp>The final design starts with the rig layout, mud program and operating requirements. We define usable volume, compartment arrangement, structural skid, piping, agitation, pumps and equipment interfaces around that information.\u003C\u002Fp>\n\u003Cp>A complete package can incorporate mud agitators, mud guns, centrifugal pumps, jet mud mixers, mud hoppers, suction manifolds, transfer lines, level monitoring and solids control equipment interfaces.\u003C\u002Fp>\n\u003Cp>SENNUO supports single-tank orders, complete drilling mud systems, rig upgrades, replacement equipment, new-rig packages, offshore projects, EPC tenders and multi-tank procurement.\u003C\u002Fp>\n\u003Cp>\u003Cstrong>Email: \u003C\u002Fstrong> info@sennuo.com\u003Cbr\u002F>\n\u003Cstrong>Tel\u002FWhatsapp:\u003C\u002Fstrong>  +86 183-6694-0225\u003C\u002Fp>\n\u003Ch2>Drilling Mud Tank Product Overview\u003C\u002Fh2>\n\u003Cp>A Drilling Mud Tank provides working volume within the surface drilling fluid circulation system.\u003C\u002Fp>\n\u003Cp>Oilfield specifications may also refer to the equipment as an \u003Cstrong>Oilfield Mud Tank, Oil Rig Mud Tank, Drilling Fluid Tank, Drilling Rig Mud Tank, Drilling Mud Storage Tank, Mud Circulation Tank, Solids Control Tank or Mud System Tank\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Cp>The terminology varies between operators, drilling contractors and rig manufacturers, but the basic requirement remains the same. The tank must store, circulate, mix and condition drilling fluid while fitting into the surface mud system.\u003C\u002Fp>\n\u003Cp>During drilling, fluid travels down the drill string and exits through the bit. It returns through the annulus while carrying drilled cuttings and formation contaminants to surface.\u003C\u002Fp>\n\u003Cp>The solids control equipment removes unwanted solids and entrained gas before the conditioned fluid enters the active tank section. Additional treatment or mixing can then take place before the mud reaches the suction tank and rig pumps.\u003C\u002Fp>\n\u003Cp>For this reason, an oilfield mud tank is more than a storage vessel. It manages active and reserve volume, provides process space for solids control, supports chemical and weighting-material addition, maintains fluid suspension and transfers conditioned mud between surface equipment.\u003C\u002Fp>\n\u003Cp>Dedicated compartments can also support slug preparation, treatment pills and specific fluid-processing duties.\u003C\u002Fp>\n\u003Cp>SENNUO configures mud systems for \u003Cstrong>water-based mud (WBM), oil-based mud (OBM), synthetic-based mud (SBM), weighted mud and high-density drilling fluids\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Ch2>Drilling Mud Tank Technical Specifications\u003C\u002Fh2>\n\u003Ch3>Drilling Mud Tank Capacity &amp; Structural Specifications\u003C\u002Fh3>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Technical Parameter\u003C\u002Fth>\n\u003Cth>Typical SENNUO Project Configuration\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Product\u003C\u002Ftd>\n\u003Ctd>Drilling Mud Tank \u002F Oilfield Mud Tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Industry\u003C\u002Ftd>\n\u003Ctd>Oil &amp; Gas Drilling\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Main Service\u003C\u002Ftd>\n\u003Ctd>Storage, circulation, mixing, conditioning and solids control\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Tank Type\u003C\u002Ftd>\n\u003Ctd>Atmospheric drilling fluid process\u002Fstorage tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Typical Nominal Capacity\u003C\u002Ftd>\n\u003Ctd>20–100 m³ per tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Approximate Capacity\u003C\u002Ftd>\n\u003Ctd>126–629 bbl per tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Configuration\u003C\u002Ftd>\n\u003Ctd>Standalone \u002F Interconnected multi-tank system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Main Geometry\u003C\u002Ftd>\n\u003Ctd>Rectangular steel tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Installation\u003C\u002Ftd>\n\u003Ctd>Skid-mounted\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Main Functions\u003C\u002Ftd>\n\u003Ctd>Active \u002F Suction \u002F Mixing \u002F Reserve \u002F Shaker \u002F Process \u002F Slug \u002F Pill\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Compartments\u003C\u002Ftd>\n\u003Ctd>Single \u002F Multi-compartment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Working Volume\u003C\u002Ftd>\n\u003Ctd>Defined from operating level, freeboard and internal layout\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drilling Fluids\u003C\u002Ftd>\n\u003Ctd>WBM \u002F OBM \u002F SBM \u002F Weighted Mud\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Structural Material\u003C\u002Ftd>\n\u003Ctd>Fabricated carbon steel\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Main Structure\u003C\u002Ftd>\n\u003Ctd>Reinforced welded tank with structural skid\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Tank Bottom\u003C\u002Ftd>\n\u003Ctd>Flat \u002F Sloped \u002F Engineered drainage arrangement\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Internal Partitions\u003C\u002Ftd>\n\u003Ctd>Process-specific arrangement\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Skid Design\u003C\u002Ftd>\n\u003Ctd>Oilfield transport and rig-move configuration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Lifting Arrangement\u003C\u002Ftd>\n\u003Ctd>Engineered lifting points\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Overall Dimensions\u003C\u002Ftd>\n\u003Ctd>Customized to rig footprint and transport envelope\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Empty Weight\u003C\u002Ftd>\n\u003Ctd>Defined on approved GA\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Operating Weight\u003C\u002Ftd>\n\u003Ctd>Calculated from mud volume, density and installed equipment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>These specifications define the main tank capacity, structural arrangement and installation requirements. Final usable volume, dimensions, weight and compartment layout are confirmed on the approved technical data sheet and general arrangement drawing.\u003C\u002Fp>\n\u003Ch3>Mud Handling, Electrical &amp; Project Configuration\u003C\u002Fh3>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Technical Parameter\u003C\u002Fth>\n\u003Cth>Typical SENNUO Project Configuration\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Agitator\u003C\u002Ftd>\n\u003Ctd>Top-mounted mechanical agitator\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Typical Agitator Power\u003C\u002Ftd>\n\u003Ctd>5.5 \u002F 7.5 \u002F 11 \u002F 15 kW\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Typical Impeller Speed\u003C\u002Ftd>\n\u003Ctd>Approx. 60–72 rpm\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Agitator Quantity\u003C\u002Ftd>\n\u003Ctd>Selected for volume, geometry and mud duty\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Gun\u003C\u002Ftd>\n\u003Ctd>Bottom and corner circulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Mixing System\u003C\u002Ftd>\n\u003Ctd>Venturi \u002F Jet mud mixer\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Hopper\u003C\u002Ftd>\n\u003Ctd>Integrated drilling fluid hopper\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mixing Pump\u003C\u002Ftd>\n\u003Ctd>Centrifugal pump\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Transfer Pump\u003C\u002Ftd>\n\u003Ctd>Centrifugal pump\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solids Control Feed Pump\u003C\u002Ftd>\n\u003Ctd>Selected for equipment duty\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Pump Suction\u003C\u002Ftd>\n\u003Ctd>Integrated suction manifold\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Inter-Tank Transfer\u003C\u002Ftd>\n\u003Ctd>Transfer manifold with isolation valves\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Equalizing Lines\u003C\u002Ftd>\n\u003Ctd>Between selected tanks or compartments\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Overflow\u003C\u002Ftd>\n\u003Ctd>Arranged around operating fluid level\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drainage\u003C\u002Ftd>\n\u003Ctd>Low-point drain and cleanout arrangement\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Piping Connections\u003C\u002Ftd>\n\u003Ctd>Flanged \u002F Grooved \u002F Project-defined\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Level Monitoring\u003C\u002Ftd>\n\u003Ctd>Visual \u002F Mechanical \u002F Electronic\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Working Deck\u003C\u002Ftd>\n\u003Ctd>Anti-slip operating platform\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Access\u003C\u002Ftd>\n\u003Ctd>Walkways \u002F Stairs \u002F Ladders \u002F Handrails\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Electrical Frequency\u003C\u002Ftd>\n\u003Ctd>50 Hz \u002F 60 Hz\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Typical Voltage\u003C\u002Ftd>\n\u003Ctd>380 \u002F 400 \u002F 415 \u002F 440 \u002F 460 V\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Motor Package\u003C\u002Ftd>\n\u003Ctd>Industrial \u002F Explosion-Protected\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Electrical Control\u003C\u002Ftd>\n\u003Ctd>Local \u002F Package control\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Hazardous Area\u003C\u002Ftd>\n\u003Ctd>Configured to project area classification\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Coating\u003C\u002Ftd>\n\u003Ctd>Industrial anticorrosion system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Protection\u003C\u002Ftd>\n\u003Ctd>Enhanced marine coating system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Installation Environment\u003C\u002Ftd>\n\u003Ctd>Land Rig \u002F Platform \u002F Jack-Up \u002F Semi-Submersible \u002F Drillship\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Custom Manufacturing\u003C\u002Ftd>\n\u003Ctd>Capacity, compartments, piping and equipment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Replacement Service\u003C\u002Ftd>\n\u003Ctd>Existing rig interface matching\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Documentation\u003C\u002Ftd>\n\u003Ctd>GA, equipment layout, interface data and inspection records\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>Final agitator configuration, piping, electrical scope, equipment layout and project interfaces are defined according to the drilling rig, mud program and approved project requirements.\u003C\u002Fp>\n\u003Ch2>Capacity, Working Volume and Typical Dimensions\u003C\u002Fh2>\n\u003Cp>Oilfield RFQs commonly specify \u003Cstrong>drilling mud tank capacity\u003C\u002Fstrong> in cubic metres or barrels.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Nominal Volume\u003C\u002Fth>\n\u003Cth>Approx. Capacity\u003C\u002Fth>\n\u003Cth>Typical Duty\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>20 m³\u003C\u002Ftd>\n\u003Ctd>126 bbl\u003C\u002Ftd>\n\u003Ctd>Process, slug, pill or mixing tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>30 m³\u003C\u002Ftd>\n\u003Ctd>189 bbl\u003C\u002Ftd>\n\u003Ctd>Mixing, process or active tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>40 m³\u003C\u002Ftd>\n\u003Ctd>252 bbl\u003C\u002Ftd>\n\u003Ctd>Active, mixing or reserve tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>50 m³\u003C\u002Ftd>\n\u003Ctd>314 bbl\u003C\u002Ftd>\n\u003Ctd>Active or reserve tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>60 m³\u003C\u002Ftd>\n\u003Ctd>377 bbl\u003C\u002Ftd>\n\u003Ctd>High-volume active \u002F reserve module\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>80 m³\u003C\u002Ftd>\n\u003Ctd>503 bbl\u003C\u002Ftd>\n\u003Ctd>Large active or reserve tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>100 m³\u003C\u002Ftd>\n\u003Ctd>629 bbl\u003C\u002Ftd>\n\u003Ctd>Large-capacity \u002F modular mud system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>Nominal volume and usable working volume are not the same.\u003C\u002Fp>\n\u003Cp>The operating level requires freeboard, while bulkheads, structural members, piping and installed equipment occupy additional internal space. A nominal 50 m³ tank therefore does not automatically provide 50 m³ of usable active mud volume.\u003C\u002Fp>\n\u003Cp>This difference matters when sizing \u003Cstrong>mud tanks for drilling rigs\u003C\u002Fstrong>, because usable volume determines how much fluid the surface system can actually manage.\u003C\u002Fp>\n\u003Cp>Dimensions also vary with tank duty, capacity, compartment arrangement, equipment layout and transport restrictions.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Capacity Range\u003C\u002Fth>\n\u003Cth>Typical Length\u003C\u002Fth>\n\u003Cth>Typical Width\u003C\u002Fth>\n\u003Cth>Typical Height\u003C\u002Fth>\n\u003Cth>Common Duty\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>20–30 m³\u003C\u002Ftd>\n\u003Ctd>Approx. 6–9 m\u003C\u002Ftd>\n\u003Ctd>Approx. 2.0–2.2 m\u003C\u002Ftd>\n\u003Ctd>Approx. 1.8–2.1 m\u003C\u002Ftd>\n\u003Ctd>Process \u002F Mixing \u002F Reserve\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>40–50 m³\u003C\u002Ftd>\n\u003Ctd>Approx. 9.5–10.5 m\u003C\u002Ftd>\n\u003Ctd>Approx. 2.35–2.8 m\u003C\u002Ftd>\n\u003Ctd>Approx. 2.1–2.35 m\u003C\u002Ftd>\n\u003Ctd>Active \u002F Mixing \u002F Reserve\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>60–80 m³\u003C\u002Ftd>\n\u003Ctd>Approx. 11–13.5 m\u003C\u002Ftd>\n\u003Ctd>Approx. 2.8–3.0 m\u003C\u002Ftd>\n\u003Ctd>Approx. 2.35–2.4 m\u003C\u002Ftd>\n\u003Ctd>Large active \u002F reserve system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>80–100 m³\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003Ctd>Large rig \u002F modular system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>These dimensions are engineering references rather than fixed SENNUO catalogue sizes.\u003C\u002Fp>\n\u003Cp>Land projects often require a transportable \u003Cstrong>mud tank skid\u003C\u002Fstrong> that fits road and rig-move limits. Offshore installations usually place more emphasis on deck footprint, lifting, structural loading and maintenance access.\u003C\u002Fp>\n\u003Cp>The approved GA therefore follows the actual installation rather than one standard envelope.\u003C\u002Fp>\n\u003Ch2>How the Drilling Mud Tank System Works\u003C\u002Fh2>\n\u003Cp>The tank system forms part of the surface drilling fluid circulation loop.\u003C\u002Fp>\n\u003Cp>A typical fluid path is:\u003C\u002Fp>\n\u003Cp>\u003Cstrong>Wellbore Return → Flowline → Shale Shaker → Secondary Solids Control → Active Mud Tank → Suction Mud Tank → Mud Pumps → Standpipe → Drill String → Bit → Annulus → Surface\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp>The exact treatment sequence follows the drilling program and installed solids control package.\u003C\u002Fp>\n\u003Cp>Returning mud first reaches the primary solids-removal stage. Pumps then move the fluid through the required downstream treatment equipment.\u003C\u002Fp>\n\u003Cp>Once conditioned mud reaches the active tanks, mechanical agitators maintain bulk circulation and mud guns improve movement in lower-flow areas.\u003C\u002Fp>\n\u003Cp>When the drilling crew needs to prepare new mud or adjust existing fluid properties, the mixing section introduces bentonite, barite, polymers or other drilling chemicals.\u003C\u002Fp>\n\u003Cp>The conditioned fluid then moves to the suction section and rig mud pumps.\u003C\u002Fp>\n\u003Cp>Together, these stages form a coordinated \u003Cstrong>drilling mud circulation system\u003C\u002Fstrong> for storage, treatment, mixing, transfer and pump suction.\u003C\u002Fp>\n\u003Ch2>Main Types of Drilling Mud Tanks\u003C\u002Fh2>\n\u003Cp>A drilling rig usually needs several tank functions rather than one oversized storage vessel.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Mud Tank Type\u003C\u002Fth>\n\u003Cth>Main Function\u003C\u002Fth>\n\u003Cth>Typical Application\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Active Mud Tank\u003C\u002Ftd>\n\u003Ctd>Holds circulating conditioned mud\u003C\u002Ftd>\n\u003Ctd>Main active system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Suction Mud Tank\u003C\u002Ftd>\n\u003Ctd>Supplies fluid to rig mud pumps\u003C\u002Ftd>\n\u003Ctd>Final active stage\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Mixing Tank\u003C\u002Ftd>\n\u003Ctd>Mixes bentonite, barite and chemicals\u003C\u002Ftd>\n\u003Ctd>Mud preparation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Reserve Mud Tank\u003C\u002Ftd>\n\u003Ctd>Stores prepared drilling fluid\u003C\u002Ftd>\n\u003Ctd>Backup fluid capacity\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Shaker Tank\u003C\u002Ftd>\n\u003Ctd>Receives fluid around primary screening\u003C\u002Ftd>\n\u003Ctd>Primary solids control\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Process Mud Tank\u003C\u002Ftd>\n\u003Ctd>Supports downstream treatment equipment\u003C\u002Ftd>\n\u003Ctd>Hydrocyclone \u002F centrifuge service\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Slug Tank\u003C\u002Ftd>\n\u003Ctd>Prepares higher-density slug fluid\u003C\u002Ftd>\n\u003Ctd>Tripping operations\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Pill Tank\u003C\u002Ftd>\n\u003Ctd>Prepares dedicated treatment fluid\u003C\u002Ftd>\n\u003Ctd>Sweeps \u002F weighted pills \u002F LCM\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Skid-Mounted Mud Tank\u003C\u002Ftd>\n\u003Ctd>Provides transportable mud capacity\u003C\u002Ftd>\n\u003Ctd>Mobile land drilling\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Multi-Compartment Mud Tank\u003C\u002Ftd>\n\u003Ctd>Combines several functions in one skid\u003C\u002Ftd>\n\u003Ctd>Compact installation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Mud Tank\u003C\u002Ftd>\n\u003Ctd>Provides integrated fluid handling\u003C\u002Ftd>\n\u003Ctd>Offshore drilling\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Ch3>Active Mud Tank\u003C\u002Fh3>\n\u003Cp>An Active Mud Tank contains drilling fluid that remains in normal circulation between the wellbore and surface system.\u003C\u002Fp>\n\u003Cp>It usually receives treated mud from the solids control section before transferring fluid toward the suction tank. Continuous agitation helps maintain consistent mud properties and keeps weighting materials suspended.\u003C\u002Fp>\n\u003Cp>Large rigs can connect several active tanks when one module cannot provide the required working volume.\u003C\u002Fp>\n\u003Ch3>Suction Mud Tank\u003C\u002Fh3>\n\u003Cp>The Suction Mud Tank forms the final active stage before the rig mud pumps.\u003C\u002Fp>\n\u003Cp>A suction manifold connects selected compartments to the pumps. Isolation valves allow the crew to choose the fluid source and manage individual tanks without shutting down the complete active system.\u003C\u002Fp>\n\u003Cp>Stable suction is especially important during high-flow drilling, large-hole sections and high-ROP operations.\u003C\u002Fp>\n\u003Ch3>Mud Mixing Tank\u003C\u002Fh3>\n\u003Cp>A \u003Cstrong>Mud Mixing Tank\u003C\u002Fstrong>, also known as a Drilling Fluid Mixing Tank, provides dedicated working volume for new mud preparation and adjustment of existing fluid.\u003C\u002Fp>\n\u003Cp>A typical package combines a centrifugal pump, venturi mixer, mud hopper, return piping and mechanical agitation.\u003C\u002Fp>\n\u003Cp>This arrangement supports bentonite hydration, barite addition, polymer mixing, density adjustment and routine drilling fluid treatment.\u003C\u002Fp>\n\u003Ch3>Reserve, Process, Slug and Pill Tanks\u003C\u002Fh3>\n\u003Cp>A Reserve Mud Tank holds prepared drilling fluid outside the immediate active system. It provides additional capacity for fluid displacement, mud-weight changes, treatment and well-control preparation.\u003C\u002Fp>\n\u003Cp>Shaker and process tanks provide receiving, suction or return volume around the solids control equipment.\u003C\u002Fp>\n\u003Cp>Slug and pill tanks handle smaller purpose-built batches, including high-density slugs, viscous sweeps, weighted pills and lost-circulation treatments.\u003C\u002Fp>\n\u003Ch2>Modular and Multi-Compartment Mud Tank Systems\u003C\u002Fh2>\n\u003Cp>A standalone tank works well for replacement or dedicated service. A complete rig usually needs several fluid-management stages working together.\u003C\u002Fp>\n\u003Cp>A \u003Cstrong>Modular Mud Tank System\u003C\u002Fstrong> connects individual skids through suction manifolds, transfer piping, equalizing lines, overflow piping and drainage.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>System Configuration\u003C\u002Fth>\n\u003Cth>Best Use\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Single Mud Tank\u003C\u002Ftd>\n\u003Ctd>Replacement or dedicated service\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Multi-Compartment Tank\u003C\u002Ftd>\n\u003Ctd>Several functions within one skid\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Modular Mud Tank System\u003C\u002Ftd>\n\u003Ctd>Complete drilling fluid circulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Land Rig Mud System\u003C\u002Ftd>\n\u003Ctd>Transportable onshore package\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Mud System\u003C\u002Ftd>\n\u003Ctd>Compact offshore installation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Replacement Mud System\u003C\u002Ftd>\n\u003Ctd>Rig refurbishment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Custom Mud System\u003C\u002Ftd>\n\u003Ctd>New rig or project-specific system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>A multi-compartment tank can combine active, mixing and suction sections within one skid, while another module can carry reserve and process duties.\u003C\u002Fp>\n\u003Cp>Internal bulkheads separate each function. Isolation valves and equalizing lines control communication between selected sections.\u003C\u002Fp>\n\u003Cp>Compartment size follows actual working volume and process duty instead of simply dividing the tank into equal sections.\u003C\u002Fp>\n\u003Cp>The modular arrangement also improves installation flexibility. Land-rig tanks can separate for transportation, while offshore systems can place several process functions within limited deck space.\u003C\u002Fp>\n\u003Ch2>Tank Structure, Load, Drainage and Access\u003C\u002Fh2>\n\u003Cp>A reinforced skid supports the tank body, drilling fluid, installed equipment, process piping, working platforms and operating personnel.\u003C\u002Fp>\n\u003Cp>Mud density directly affects operating weight. A tank carrying weighted mud sees a much greater load than the same tank filled with lower-density fluid, so normal and maximum mud density form part of the structural calculation.\u003C\u002Fp>\n\u003Cp>Tank-bottom geometry also affects fluid conditioning and maintenance.\u003C\u002Fp>\n\u003Cp>Drilled solids and weighting material tend to accumulate in lower-flow areas. Depending on service, the tank can use a flat, sloped or engineered drainage arrangement.\u003C\u002Fp>\n\u003Cp>Low-point drains simplify fluid removal during cleaning. Mud guns improve movement near the bottom and corners, while cleanout access allows crews to remove settled material during planned maintenance.\u003C\u002Fp>\n\u003Cp>Operator access is integrated into the layout. Anti-slip decks, stairs, ladders, handrails and interconnected walkways provide practical access to pumps, agitators, valves, level indicators and treatment equipment.\u003C\u002Fp>\n\u003Ch2>Drilling Mud Tank with Agitator and Mixing System\u003C\u002Fh2>\n\u003Cp>Reliable agitation is particularly important in active, mixing and weighted-mud tanks.\u003C\u002Fp>\n\u003Cp>A \u003Cstrong>Drilling Mud Tank with Agitator\u003C\u002Fstrong> uses mechanical circulation to maintain more uniform fluid properties throughout the compartment.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Typical Motor Power\u003C\u002Fth>\n\u003Cth>Typical Impeller Speed\u003C\u002Fth>\n\u003Cth>Typical Impeller Diameter\u003C\u002Fth>\n\u003Cth>Common Duty\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>5.5 kW\u003C\u002Ftd>\n\u003Ctd>60–72 rpm\u003C\u002Ftd>\n\u003Ctd>Approx. 600–850 mm\u003C\u002Ftd>\n\u003Ctd>Small compartment \u002F light mixing\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>7.5 kW\u003C\u002Ftd>\n\u003Ctd>60–72 rpm\u003C\u002Ftd>\n\u003Ctd>Approx. 750–950 mm\u003C\u002Ftd>\n\u003Ctd>General mud tank service\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>11 kW\u003C\u002Ftd>\n\u003Ctd>60–72 rpm\u003C\u002Ftd>\n\u003Ctd>Approx. 850–1050 mm\u003C\u002Ftd>\n\u003Ctd>Active \u002F weighted mud service\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>15 kW\u003C\u002Ftd>\n\u003Ctd>60–72 rpm\u003C\u002Ftd>\n\u003Ctd>Approx. 900–1200 mm\u003C\u002Ftd>\n\u003Ctd>Large volume \u002F demanding mixing\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>These figures are typical engineering references. Final motor power, impeller diameter, shaft length and agitator quantity follow the usable volume, compartment geometry and drilling fluid properties.\u003C\u002Fp>\n\u003Cp>Mud guns work with the agitators by directing fluid toward bottoms, corners and other low-flow zones. Combining both methods helps limit barite and solids accumulation.\u003C\u002Fp>\n\u003Cp>For drilling fluid preparation, a typical \u003Cstrong>mud mixing system for drilling rig service\u003C\u002Fstrong> follows this circulation path:\u003C\u002Fp>\n\u003Cp>\u003Cstrong>Mixing Tank → Centrifugal Pump → Venturi Jet Mixer → Mud Hopper → Return Line → Mixing Tank\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp>The pump moves drilling fluid through the venturi, creating suction at the hopper. Bentonite, barite and other drilling chemicals enter the fluid stream before returning to the tank.\u003C\u002Fp>\n\u003Cp>Mechanical agitation continues the conditioning process after the mud returns.\u003C\u002Fp>\n\u003Ch2>Piping, Manifolds and Solids Control Integration\u003C\u002Fh2>\n\u003Cp>Tank performance depends heavily on the process piping and fluid route.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Piping \u002F Manifold\u003C\u002Fth>\n\u003Cth>Main Duty\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Pump Suction Line\u003C\u002Ftd>\n\u003Ctd>Supplies active mud to rig mud pumps\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Inter-Tank Transfer Line\u003C\u002Ftd>\n\u003Ctd>Transfers fluid between tank modules\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mixing Suction Line\u003C\u002Ftd>\n\u003Ctd>Feeds the mud mixing pump\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mixing Return Line\u003C\u002Ftd>\n\u003Ctd>Returns mixed mud to the tank\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solids Control Feed Line\u003C\u002Ftd>\n\u003Ctd>Supplies treatment equipment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Treated Mud Return Line\u003C\u002Ftd>\n\u003Ctd>Returns conditioned drilling fluid\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Equalizing Line\u003C\u002Ftd>\n\u003Ctd>Connects selected tanks or compartments\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Overflow Line\u003C\u002Ftd>\n\u003Ctd>Controls high-level fluid transfer\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Gun Manifold\u003C\u002Ftd>\n\u003Ctd>Supplies tank mud guns\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drain Line\u003C\u002Ftd>\n\u003Ctd>Supports cleaning and fluid removal\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>The suction manifold links the active tanks with the drilling pumps. Transfer piping moves fluid between active, mixing and reserve sections. Equalizing lines connect selected compartments, while overflow piping maintains the intended high-level flow path.\u003C\u002Fp>\n\u003Cp>The tank package also forms the hydraulic and structural base for surface solids control equipment.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Integrated Equipment\u003C\u002Fth>\n\u003Cth>Role in the Mud System\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drilling Shale Shaker\u003C\u002Ftd>\n\u003Ctd>Primary drilled-solids removal\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Vacuum Degasser\u003C\u002Ftd>\n\u003Ctd>Removes entrained gas\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drilling Mud Desander\u003C\u002Ftd>\n\u003Ctd>Removes larger abrasive solids\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drilling Mud Desilter\u003C\u002Ftd>\n\u003Ctd>Removes finer hydrocyclone solids\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drilling Mud Cleaner\u003C\u002Ftd>\n\u003Ctd>Combines hydrocyclone separation and screening\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Decanter Centrifuge\u003C\u002Ftd>\n\u003Ctd>Controls fine and low-gravity solids\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Agitator\u003C\u002Ftd>\n\u003Ctd>Maintains fluid suspension\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Gun\u003C\u002Ftd>\n\u003Ctd>Improves internal circulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Centrifugal Pump\u003C\u002Ftd>\n\u003Ctd>Provides process feed and transfer\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Jet Mud Mixer\u003C\u002Ftd>\n\u003Ctd>Mixes drilling fluid additives\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Hopper\u003C\u002Ftd>\n\u003Ctd>Introduces bentonite, barite and chemicals\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>Equipment supports, feed-pump suction points, process piping and treated-fluid returns are coordinated with the relevant compartments.\u003C\u002Fp>\n\u003Cp>This allows the \u003Cstrong>solids control mud tank system\u003C\u002Fstrong> to operate as one process while each treatment unit performs its own specific function.\u003C\u002Fp>\n\u003Ch2>Mud Tanks for WBM, OBM, SBM and Weighted Drilling Fluid\u003C\u002Fh2>\n\u003Cp>Different drilling fluids create different requirements for storage, circulation, agitation and recovery.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Drilling Fluid\u003C\u002Fth>\n\u003Cth>Main Tank-System Focus\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Water-Based Mud (WBM)\u003C\u002Ftd>\n\u003Ctd>Efficient mixing, circulation and solids removal\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Oil-Based Mud (OBM)\u003C\u002Ftd>\n\u003Ctd>Controlled handling, recovery and agitation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Synthetic-Based Mud (SBM)\u003C\u002Ftd>\n\u003Ctd>Fluid recovery and offshore integration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Weighted WBM\u003C\u002Ftd>\n\u003Ctd>Barite suspension and density consistency\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Weighted OBM \u002F SBM\u003C\u002Ftd>\n\u003Ctd>Strong agitation and controlled recovery\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>High-Density Mud\u003C\u002Ftd>\n\u003Ctd>Structural load, mixing and agitation capacity\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>Water-based systems usually place greater emphasis on mixing efficiency and solids removal.\u003C\u002Fp>\n\u003Cp>Oil-based and synthetic-based systems also require controlled fluid handling and recovery.\u003C\u002Fp>\n\u003Cp>Weighted mud creates an additional challenge because barite settles when local circulation weakens. Mechanical agitators maintain bulk movement, while mud guns improve circulation around tank bottoms and corners.\u003C\u002Fp>\n\u003Cp>Higher mud density also increases structural load. Maximum density therefore affects both tank design and agitation requirements.\u003C\u002Fp>\n\u003Ch2>Land Rig and Offshore Mud Tank Systems\u003C\u002Fh2>\n\u003Cp>SENNUO supplies \u003Cstrong>mud tank systems for drilling rigs\u003C\u002Fstrong> in onshore and offshore environments.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Rig Environment\u003C\u002Fth>\n\u003Cth>Main Engineering Priorities\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Land Drilling Rig\u003C\u002Ftd>\n\u003Ctd>Modular layout, transport and rig moves\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Skid-Mounted Rig\u003C\u002Ftd>\n\u003Ctd>Repeatable field connections\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Fixed Offshore Platform\u003C\u002Ftd>\n\u003Ctd>Deck utilization and corrosion protection\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Jack-Up Rig\u003C\u002Ftd>\n\u003Ctd>Compact layout and equipment access\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Semi-Submersible Rig\u003C\u002Ftd>\n\u003Ctd>Integrated mud processing\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drillship\u003C\u002Ftd>\n\u003Ctd>High equipment integration within limited space\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rig Upgrade\u003C\u002Ftd>\n\u003Ctd>Existing-system compatibility\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Replacement Project\u003C\u002Ftd>\n\u003Ctd>Dimensional and piping-interface matching\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Ch3>Land Rig Mud Tank System\u003C\u002Fh3>\n\u003Cp>A Land Rig Mud Tank System needs sufficient fluid capacity without sacrificing mobility.\u003C\u002Fp>\n\u003Cp>Because land rigs move between well locations, tank dimensions, structural skids, lifting points and field connections must support repeated rig moves.\u003C\u002Fp>\n\u003Cp>A complete land package can combine active, reserve, mixing, suction and process tanks while allowing individual modules to separate for transportation.\u003C\u002Fp>\n\u003Ch3>Offshore Mud Tank System\u003C\u002Fh3>\n\u003Cp>An Offshore Mud Tank System must provide sufficient active and reserve capacity within a restricted deck footprint.\u003C\u002Fp>\n\u003Cp>The package also needs practical equipment access, engineered lifting, structural load control, marine corrosion protection and suitable electrical equipment.\u003C\u002Fp>\n\u003Cp>Applications include fixed platforms, jack-up rigs, semi-submersible drilling units and drillships.\u003C\u002Fp>\n\u003Cp>Jack-up packages often prioritize compact arrangement and service access. Semi-submersibles and drillships require more extensive integration of tank capacity, piping and solids control equipment.\u003C\u002Fp>\n\u003Ch2>Drilling Applications and Well Conditions\u003C\u002Fh2>\n\u003Cp>Tank requirements change with circulation rate, drilling rate, mud density and well profile.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Drilling Application\u003C\u002Fth>\n\u003Cth>Main Mud Tank Requirement\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Oil Well Drilling\u003C\u002Ftd>\n\u003Ctd>Reliable active mud circulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Gas Well Drilling\u003C\u002Ftd>\n\u003Ctd>Fluid conditioning and solids control\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Exploration Drilling\u003C\u002Ftd>\n\u003Ctd>Flexible storage and treatment arrangement\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Development Drilling\u003C\u002Ftd>\n\u003Ctd>Continuous mud circulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Vertical Well\u003C\u002Ftd>\n\u003Ctd>Active, reserve, mixing and suction functions\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Directional Drilling\u003C\u002Ftd>\n\u003Ctd>Stable drilling fluid properties\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Horizontal Well\u003C\u002Ftd>\n\u003Ctd>Effective solids control and active-volume management\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Extended-Reach Drilling\u003C\u002Ftd>\n\u003Ctd>Long-cycle fluid conditioning\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>High-ROP Drilling\u003C\u002Ftd>\n\u003Ctd>Higher solids-processing demand\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Large-Hole Section\u003C\u002Ftd>\n\u003Ctd>High circulation capacity\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Deep Well\u003C\u002Ftd>\n\u003Ctd>Weighted mud handling\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>HPHT Drilling\u003C\u002Ftd>\n\u003Ctd>High-density drilling fluid management\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Exploration\u003C\u002Ftd>\n\u003Ctd>Compact integrated mud system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Development\u003C\u002Ftd>\n\u003Ctd>Reliable storage and treatment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Deepwater Drilling\u003C\u002Ftd>\n\u003Ctd>Fluid recovery and offshore integration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rig Upgrade\u003C\u002Ftd>\n\u003Ctd>Existing interface compatibility\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rig Refurbishment\u003C\u002Ftd>\n\u003Ctd>Replacement and modernization\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>High-ROP drilling and large-hole sections produce more drilled solids, increasing the load on the surface treatment system. These operations need sufficient working volume and processing capacity to maintain continuous circulation.\u003C\u002Fp>\n\u003Cp>Directional, horizontal and extended-reach wells often involve longer circulation cycles and tighter control of drilling fluid properties. Reliable agitation becomes increasingly important when these programs use weighted mud.\u003C\u002Fp>\n\u003Cp>Deep and HPHT wells can require high-density fluids. These increase structural loading and the tendency of barite to settle, making maximum mud density, active volume and circulation rate important design inputs.\u003C\u002Fp>\n\u003Ch2>Typical Drilling Mud Tank Packages\u003C\u002Fh2>\n\u003Cp>Different drilling projects require different levels of integration.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Package\u003C\u002Fth>\n\u003Cth>Main Components\u003C\u002Fth>\n\u003Cth>Typical Application\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Active Mud Tank Package\u003C\u002Ftd>\n\u003Ctd>Tank, agitators, mud guns, suction and transfer piping\u003C\u002Ftd>\n\u003Ctd>Active circulation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Mixing Tank Package\u003C\u002Ftd>\n\u003Ctd>Tank, pump, hopper, jet mixer and agitator\u003C\u002Ftd>\n\u003Ctd>Mud preparation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Reserve Mud Tank Package\u003C\u002Ftd>\n\u003Ctd>Tank, agitator and transfer piping\u003C\u002Ftd>\n\u003Ctd>Backup storage\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Shaker Tank Package\u003C\u002Ftd>\n\u003Ctd>Tank and shaker interfaces\u003C\u002Ftd>\n\u003Ctd>Primary solids control\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solids Control Mud Tank\u003C\u002Ftd>\n\u003Ctd>Process tank, pumps and equipment interfaces\u003C\u002Ftd>\n\u003Ctd>Drilling fluid treatment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Skid-Mounted Mud Tank\u003C\u002Ftd>\n\u003Ctd>Tank, structural skid and field connections\u003C\u002Ftd>\n\u003Ctd>Mobile land rig\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Multi-Compartment Mud Tank\u003C\u002Ftd>\n\u003Ctd>Several functions within one skid\u003C\u002Ftd>\n\u003Ctd>Compact installation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Complete Land Rig Mud System\u003C\u002Ftd>\n\u003Ctd>Multiple interconnected modules\u003C\u002Ftd>\n\u003Ctd>Onshore drilling\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Mud Tank System\u003C\u002Ftd>\n\u003Ctd>Compact integrated modules\u003C\u002Ftd>\n\u003Ctd>Offshore drilling\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Custom Mud Tank Package\u003C\u002Ftd>\n\u003Ctd>Project-specific arrangement\u003C\u002Ftd>\n\u003Ctd>New rig \u002F EPC project\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Replacement Mud Tank\u003C\u002Ftd>\n\u003Ctd>Interface-matched tank and piping\u003C\u002Ftd>\n\u003Ctd>Rig refurbishment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>A project can involve one \u003Cstrong>oilfield mud storage tank\u003C\u002Fstrong>, a replacement skid or a complete multi-tank circulation package.\u003C\u002Fp>\n\u003Ch2>SENNUO Manufacturing, Inspection and Project Support\u003C\u002Fh2>\n\u003Cp>SENNUO is a petroleum equipment manufacturer based in Dongying, Shandong Province, China. Our manufacturing base combines oilfield equipment production, engineering, inspection and project-specific configuration.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>SENNUO Manufacturing Element\u003C\u002Fth>\n\u003Cth>Company Capability\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Industry Experience\u003C\u002Ftd>\n\u003Ctd>More than 20 years in petroleum equipment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Manufacturing Base\u003C\u002Ftd>\n\u003Ctd>Dongying, Shandong, China\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Factory Area\u003C\u002Ftd>\n\u003Ctd>Approx. 20,000 m²\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Construction Area\u003C\u002Ftd>\n\u003Ctd>Approx. 10,000 m²\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Employees\u003C\u002Ftd>\n\u003Ctd>More than 100\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Professional Technicians\u003C\u002Ftd>\n\u003Ctd>More than 25\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Processing Equipment\u003C\u002Ftd>\n\u003Ctd>More than 100 sets\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Testing Capability\u003C\u002Ftd>\n\u003Ctd>Mechanical\u002Fproperty testing, measurement, NDT and product testing\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Product Scope\u003C\u002Ftd>\n\u003Ctd>Drilling, well control, solids control and related petroleum equipment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Project Support\u003C\u002Ftd>\n\u003Ctd>Technical communication, custom configuration and package integration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>This manufacturing and engineering capacity supports replacement tanks, custom mud tank skids and complete drilling fluid system projects.\u003C\u002Fp>\n\u003Cp>Production covers structural material preparation, skid fabrication, tank-shell welding, bulkhead fabrication, equipment supports, process piping, operating platforms, equipment installation and surface coating.\u003C\u002Fp>\n\u003Cp>During production and final inspection, we check dimensions, structural alignment, compartment arrangement, weld condition, leak-tightness, piping routes, connection positions, equipment installation, access structures, drainage and coating condition.\u003C\u002Fp>\n\u003Cp>The completed package is checked against the approved GA, equipment list and technical scope. Buyer-specified third-party inspection can also form part of the agreed inspection plan.\u003C\u002Fp>\n\u003Cp>Project documentation can include general arrangement drawings, equipment layouts, piping and connection data, electrical information, equipment documentation, material and inspection records, leak-test records, coating records, operating information and packing documents.\u003C\u002Fp>\n\u003Cp>These records support technical review, inspection and installation by drilling contractors, rig manufacturers, EPC companies and oilfield service providers.\u003C\u002Fp>\n\u003Ch2>Electrical, Coating and Environmental Configuration\u003C\u002Fh2>\n\u003Cp>A complete mud system can contain electric motors for agitators, centrifugal pumps and solids control equipment.\u003C\u002Fp>\n\u003Cp>Typical project supplies include \u003Cstrong>380 V, 400 V, 415 V, 440 V and 460 V\u003C\u002Fstrong>, with \u003Cstrong>50 Hz or 60 Hz\u003C\u002Fstrong> frequency.\u003C\u002Fp>\n\u003Cp>For designated hazardous drilling areas, explosion-protected motors and electrical components are configured according to the approved project specification and area classification.\u003C\u002Fp>\n\u003Cp>The steel structure also operates around drilling fluid, water, chemicals and outdoor weather.\u003C\u002Fp>\n\u003Cp>Land-rig equipment uses an industrial corrosion-protection system suited to field operation and repeated transportation. Offshore packages use enhanced coating systems for marine service.\u003C\u002Fp>\n\u003Cp>Cold-region projects can incorporate low-temperature equipment, insulation or heating arrangements. Desert packages can also include environmental and access features suited to local operating conditions.\u003C\u002Fp>\n\u003Ch2>Replacement and Custom Drilling Mud Tanks\u003C\u002Fh2>\n\u003Cp>An existing drilling rig does not always require a completely new mud system. In many cases, a \u003Cstrong>Replacement Drilling Mud Tank\u003C\u002Fstrong> provides the more practical route.\u003C\u002Fp>\n\u003Cp>For replacement work, the existing installation becomes the interface basis.\u003C\u002Fp>\n\u003Cp>Useful information includes the GA drawing, overall dimensions, piping connection sizes and positions, compartment arrangement, agitator locations, equipment mounting points, walkway interfaces and clear photographs of the existing tank.\u003C\u002Fp>\n\u003Cp>These inputs allow the new unit to match the current footprint and fluid connections.\u003C\u002Fp>\n\u003Cp>Replacement projects can also improve selected parts of the original configuration. Pumps, agitators, mud guns, piping and operator access can be upgraded while retaining the required external interfaces.\u003C\u002Fp>\n\u003Cp>For new rigs and major retrofits, SENNUO manufactures \u003Cstrong>Custom Drilling Mud Tanks\u003C\u002Fstrong> around the operating requirements.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Custom Engineering Item\u003C\u002Fth>\n\u003Cth>SENNUO Configuration\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Tank Capacity\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Working Volume\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Overall Dimensions\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Compartments\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Active Mud Volume\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Reserve Mud Volume\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Tank Bottom\u003C\u002Ftd>\n\u003Ctd>Flat \u002F Sloped \u002F Engineered\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Agitators\u003C\u002Ftd>\n\u003Ctd>Selected for volume and mud duty\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Guns\u003C\u002Ftd>\n\u003Ctd>Customized layout\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mixing \u002F Transfer Pumps\u003C\u002Ftd>\n\u003Ctd>Selected for required flow and head\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Hopper\u003C\u002Ftd>\n\u003Ctd>Integrated\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Jet Mixer\u003C\u002Ftd>\n\u003Ctd>Integrated\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Suction Manifold\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Transfer Manifold\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Process Piping\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Connection Size and Orientation\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solids Control Interfaces\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Working Platform\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Electrical System\u003C\u002Ftd>\n\u003Ctd>Project-specific\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Coating\u003C\u002Ftd>\n\u003Ctd>Land \u002F Offshore \u002F Harsh Environment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Transport Skid\u003C\u002Ftd>\n\u003Ctd>Customized\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Lifting Arrangement\u003C\u002Ftd>\n\u003Ctd>Engineered\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Replacement Interface\u003C\u002Ftd>\n\u003Ctd>Existing rig matching\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>The objective is straightforward: the tank should fit the rig and operating process rather than forcing the rig to adapt to a generic tank.\u003C\u002Fp>\n\u003Ch2>Drilling Mud Tank Price, Procurement and Supplier Evaluation\u003C\u002Fh2>\n\u003Cp>SENNUO supports standalone tank procurement, complete mud systems, new-rig projects, offshore packages, rig upgrades and EPC\u002Ftender requirements.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>Procurement Requirement\u003C\u002Fth>\n\u003Cth>SENNUO Support\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Single Replacement Tank\u003C\u002Ftd>\n\u003Ctd>Existing interface matching\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>New Rig Mud Tank\u003C\u002Ftd>\n\u003Ctd>Project-specific design\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Complete Mud Tank System\u003C\u002Ftd>\n\u003Ctd>Multi-tank integration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solids Control Package\u003C\u002Ftd>\n\u003Ctd>Tank and equipment interface integration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Multi-Tank Purchase\u003C\u002Ftd>\n\u003Ctd>Coordinated system configuration\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Offshore Rig Project\u003C\u002Ftd>\n\u003Ctd>Compact offshore layout\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rig Upgrade\u003C\u002Ftd>\n\u003Ctd>Existing equipment compatibility\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>EPC \u002F Tender RFQ\u003C\u002Ftd>\n\u003Ctd>Technical data, drawings and commercial quotation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Distributor \u002F Resale Order\u003C\u002Ftd>\n\u003Ctd>Defined configuration and documentation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Replacement Project\u003C\u002Ftd>\n\u003Ctd>Dimensional and piping compatibility\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>The same engineering approach applies to standalone replacement tanks, custom oilfield mud tanks and complete rig mud systems.\u003C\u002Fp>\n\u003Ch3>What Affects Drilling Mud Tank Price?\u003C\u002Fh3>\n\u003Cp>A \u003Cstrong>Drilling Mud Tank price\u003C\u002Fstrong> depends on technical scope rather than nominal capacity alone.\u003C\u002Fp>\n\u003Cp>Usable volume, overall dimensions, structural load, compartment arrangement and maximum mud density all influence fabrication.\u003C\u002Fp>\n\u003Cp>The final cost also reflects agitator quantity and power, centrifugal pumps, mud guns, hoppers, mixing equipment, suction and transfer manifolds, process piping, electrical components, working platforms, coating and lifting requirements.\u003C\u002Fp>\n\u003Cp>A simple reserve tank therefore has a different cost structure from a multi-compartment solids control tank fitted with pumps, agitators and process piping.\u003C\u002Fp>\n\u003Cp>Offshore units also require different structural, corrosion-protection and lifting considerations from conventional land-rig tanks.\u003C\u002Fp>\n\u003Cp>For that reason, SENNUO prepares each \u003Cstrong>Drilling Mud Tank quotation\u003C\u002Fstrong> against the actual RFQ rather than applying one generic price per cubic metre.\u003C\u002Fp>\n\u003Ch3>How to Compare a Drilling Mud Tank Manufacturer or Supplier\u003C\u002Fh3>\n\u003Cp>Nominal capacity and headline price provide only part of the comparison.\u003C\u002Fp>\n\u003Cp>Usable working volume, maximum mud density, structural design, compartment arrangement, agitator configuration, pump duties, process piping, solids control interfaces, electrical requirements, dimensions, operating weight, lifting arrangement and project documentation all influence the final package.\u003C\u002Fp>\n\u003Cp>Interface accuracy becomes especially important for replacement equipment. A lower initial price can create extra field work when the new tank does not match existing piping, supports or installation dimensions.\u003C\u002Fp>\n\u003Cp>When selecting an \u003Cstrong>Oilfield Mud Tank Supplier or Drilling Mud Tank Manufacturer in China\u003C\u002Fstrong>, buyers should also review the manufacturer’s ability to provide GA drawings, interface engineering, inspection records and complete-package coordination.\u003C\u002Fp>\n\u003Ch2>Information Required for a Drilling Mud Tank RFQ\u003C\u002Fh2>\n\u003Cp>A clear RFQ allows the correct technical configuration to be developed before pricing.\u003C\u002Fp>\n\u003Ctable>\n\u003Ctbody>\n\u003Ctr>\n\u003Cth>RFQ Information\u003C\u002Fth>\n\u003Cth>Project Data\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rig Type\u003C\u002Ftd>\n\u003Ctd>Land \u002F Platform \u002F Jack-Up \u002F Semi-Submersible \u002F Drillship\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Rig Rating\u003C\u002Ftd>\n\u003Ctd>HP \u002F Rig model\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Well Type\u003C\u002Ftd>\n\u003Ctd>Vertical \u002F Directional \u002F Horizontal \u002F ERD \u002F Deep \u002F HPHT\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Required Tank Capacity\u003C\u002Ftd>\n\u003Ctd>m³ \u002F bbl\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Required Working Volume\u003C\u002Ftd>\n\u003Ctd>m³ \u002F bbl\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Active Mud Volume\u003C\u002Ftd>\n\u003Ctd>m³ \u002F bbl\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Reserve Mud Volume\u003C\u002Ftd>\n\u003Ctd>m³ \u002F bbl\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Number of Tanks\u003C\u002Ftd>\n\u003Ctd>Individual \u002F Complete System\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Drilling Fluid\u003C\u002Ftd>\n\u003Ctd>WBM \u002F OBM \u002F SBM\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Normal Mud Density\u003C\u002Ftd>\n\u003Ctd>sg \u002F ppg \u002F kg\u002Fm³\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Maximum Mud Density\u003C\u002Ftd>\n\u003Ctd>sg \u002F ppg \u002F kg\u002Fm³\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Maximum Circulation Rate\u003C\u002Ftd>\n\u003Ctd>GPM \u002F L\u002Fmin \u002F m³\u002Fh\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Maximum Tank Envelope\u003C\u002Ftd>\n\u003Ctd>L × W × H\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Required Compartments\u003C\u002Ftd>\n\u003Ctd>Active \u002F Mixing \u002F Reserve \u002F Suction \u002F Shaker \u002F Process \u002F Slug \u002F Pill\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Agitators\u003C\u002Ftd>\n\u003Ctd>Quantity \u002F power\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Guns\u003C\u002Ftd>\n\u003Ctd>Quantity \u002F layout\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mixing Pump\u003C\u002Ftd>\n\u003Ctd>Flow \u002F head \u002F power\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Transfer Pump\u003C\u002Ftd>\n\u003Ctd>Flow \u002F head \u002F power\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Mud Hopper\u003C\u002Ftd>\n\u003Ctd>Required duty\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Main Suction Connection\u003C\u002Ftd>\n\u003Ctd>Size \u002F orientation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Transfer Connections\u003C\u002Ftd>\n\u003Ctd>Size \u002F orientation\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Solids Control Interfaces\u003C\u002Ftd>\n\u003Ctd>Equipment \u002F piping requirements\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Electrical Supply\u003C\u002Ftd>\n\u003Ctd>Voltage \u002F frequency\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Hazardous Area\u003C\u002Ftd>\n\u003Ctd>Classification\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Coating\u003C\u002Ftd>\n\u003Ctd>Land \u002F Offshore \u002F Special Environment\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Transportation Limits\u003C\u002Ftd>\n\u003Ctd>Maximum dimensions \u002F weight\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Lifting Requirements\u003C\u002Ftd>\n\u003Ctd>Land \u002F Offshore\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Existing Rig Interface\u003C\u002Ftd>\n\u003Ctd>GA \u002F dimensions \u002F photographs\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Quantity\u003C\u002Ftd>\n\u003Ctd>Tanks \u002F systems\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Delivery Destination\u003C\u002Ftd>\n\u003Ctd>Country \u002F port \u002F rig base\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\n\u003C\u002Ftable>\n\u003Cp>For a new rig, the most useful starting information is the active and reserve mud volume, circulation rate, drilling fluid program, installation footprint and solids control arrangement.\u003C\u002Fp>\n\u003Cp>For a replacement tank, provide the existing GA, measured dimensions, connection positions and equipment layout.\u003C\u002Fp>\n\u003Cp>For an EPC tender or complete \u003Cstrong>drilling mud system RFQ\u003C\u002Fstrong>, send the technical specification together with quantity, inspection scope and documentation requirements.\u003C\u002Fp>\n\u003Ch2>Why Choose SENNUO for a Drilling Mud Tank Project?\u003C\u002Fh2>\n\u003Cp>SENNUO combines petroleum equipment manufacturing with project-based engineering.\u003C\u002Fp>\n\u003Cp>A mud tank is not treated as an isolated steel vessel. Usable volume, compartments, structural design, agitation, pumps, manifolds, piping, electrical equipment and solids control interfaces all form part of the same drilling fluid process.\u003C\u002Fp>\n\u003Cp>Our wider oilfield equipment experience also helps the engineering team understand how the tank interacts with mud pumps, solids control equipment and the drilling rig.\u003C\u002Fp>\n\u003Cp>For a new rig, we can supply one tank or a complete modular mud system. For an existing rig, we can match the required interfaces and improve selected parts of the original arrangement.\u003C\u002Fp>\n\u003Cp>Land and offshore projects receive different solutions for transportation, lifting, corrosion protection and equipment integration.\u003C\u002Fp>\n\u003Cp>This project-based approach supports drilling contractors, rig builders, EPC companies, oilfield service companies and procurement teams looking for a \u003Cstrong>Drilling Mud Tank Manufacturer and Supplier\u003C\u002Fstrong> capable of both fabrication and system integration.\u003C\u002Fp>\n\u003Ch2>Frequently Asked Questions About Drilling Mud Tanks\u003C\u002Fh2>\n\u003Ch3>1. What is a Drilling Mud Tank used for on an oil and gas drilling rig?\u003C\u002Fh3>\n\u003Cp>A \u003Cstrong>Drilling Mud Tank\u003C\u002Fstrong> provides working volume for drilling fluid storage, circulation, mixing, conditioning and solids control within the surface mud system. During drilling, treated fluid moves through the active tank system before reaching the suction tank and rig mud pumps for recirculation downhole.\u003C\u002Fp>\n\u003Cp>Depending on the rig layout, dedicated compartments can also support mud mixing, reserve storage, solids control processing, slug preparation and treatment pills. Oilfield specifications may also use terms such as Oilfield Mud Tank, Drilling Fluid Tank, Mud Storage Tank or Mud Circulation Tank for similar equipment.\u003C\u002Fp>\n\u003Ch3>2. What types of Drilling Mud Tanks does SENNUO manufacture?\u003C\u002Fh3>\n\u003Cp>SENNUO manufactures Active Mud Tanks, Suction Mud Tanks, Mud Mixing Tanks, Reserve Mud Tanks, Shaker Tanks, Process Tanks, Slug Tanks, Pill Tanks, Skid-Mounted Mud Tanks and Multi-Compartment Mud Tanks. These units can operate individually or form a \u003Cstrong>Modular Drilling Mud Tank System\u003C\u002Fstrong> for complete drilling fluid circulation.\u003C\u002Fp>\n\u003Cp>We configure tank functions around the actual mud process, available rig footprint and required working volume. Applications include land drilling rigs, offshore platforms, jack-up rigs, semi-submersibles, drillships, new-rig packages and existing mud-system upgrades.\u003C\u002Fp>\n\u003Ch3>3. What Drilling Mud Tank capacities are available?\u003C\u002Fh3>\n\u003Cp>Typical individual SENNUO Drilling Mud Tank configurations cover \u003Cstrong>20–100 m³, approximately 126–629 bbl per tank\u003C\u002Fstrong>. Larger drilling rigs can connect several modules to achieve the required active mud volume, reserve capacity and process volume.\u003C\u002Fp>\n\u003Cp>Nominal tank capacity and usable working volume are not identical because operating freeboard, internal bulkheads, piping and installed equipment occupy part of the internal space. Final tank size and module quantity are therefore selected according to the drilling program, circulation demand, rig layout and required fluid inventory.\u003C\u002Fp>\n\u003Ch3>4. How do I select the right Drilling Mud Tank size for a land or offshore drilling rig?\u003C\u002Fh3>\n\u003Cp>Start with the required active mud volume, reserve capacity and maximum circulation rate. Mud density, drilling fluid type, well profile, solids control arrangement and available installation space also affect the final tank configuration.\u003C\u002Fp>\n\u003Cp>Land rigs often need skid dimensions that suit road transportation and frequent rig moves, while offshore mud tanks must work within restricted deck space and lifting limits. For deep wells, horizontal drilling, high-ROP operations or weighted mud service, the design also needs to account for higher fluid inventory, solids loading and operating weight.\u003C\u002Fp>\n\u003Ch3>5. Can SENNUO supply a complete Modular Drilling Mud Tank System?\u003C\u002Fh3>\n\u003Cp>Yes. SENNUO supplies standalone tanks as well as \u003Cstrong>complete Modular Mud Tank Systems\u003C\u002Fstrong> for new rigs, upgrades and EPC projects. A complete package can combine active, reserve, mixing, suction, shaker, process, slug and pill functions according to the drilling fluid process.\u003C\u002Fp>\n\u003Cp>The system can also integrate mud agitators, mud guns, centrifugal pumps, jet mud mixers, mud hoppers, suction manifolds, transfer lines and solids control equipment interfaces. Individual tank skids connect through the required piping and manifolds to create a coordinated drilling mud circulation system.\u003C\u002Fp>\n\u003Ch3>6. Can a Drilling Mud Tank integrate with shale shakers and other solids control equipment?\u003C\u002Fh3>\n\u003Cp>Yes. A \u003Cstrong>Solids Control Mud Tank System\u003C\u002Fstrong> can provide the structural supports, process compartments, feed points and return connections required for shale shakers, vacuum degassers, drilling mud desanders, desilters, mud cleaners and decanter centrifuges. The exact arrangement follows the drilling program and treatment process rather than one fixed equipment sequence.\u003C\u002Fp>\n\u003Cp>SENNUO coordinates equipment mounting positions, centrifugal pump suction points, process piping and treated-fluid returns with the tank layout so that solids removal, fluid conditioning and active mud circulation work as one integrated surface system.\u003C\u002Fp>\n\u003Ch3>7. Can SENNUO Drilling Mud Tanks handle WBM, OBM, SBM and weighted drilling fluids?\u003C\u002Fh3>\n\u003Cp>Yes. SENNUO configures Oilfield Mud Tanks for \u003Cstrong>water-based mud (WBM), oil-based mud (OBM), synthetic-based mud (SBM) and weighted drilling fluids\u003C\u002Fstrong>. WBM systems typically emphasize efficient circulation, mixing and solids removal, while OBM and SBM applications also require controlled fluid handling and recovery.\u003C\u002Fp>\n\u003Cp>Weighted and high-density mud place greater demands on agitation because barite can settle in low-flow areas. Higher mud density also increases the operating load on the tank structure, so both fluid density and agitation duty are considered during engineering.\u003C\u002Fp>\n\u003Ch3>8. What mud agitator and mixing system can be installed on a Drilling Mud Tank?\u003C\u002Fh3>\n\u003Cp>A \u003Cstrong>Drilling Mud Tank with Agitator\u003C\u002Fstrong> can use typical motor powers of 5.5, 7.5, 11 or 15 kW, with common impeller speeds around 60–72 rpm. Final agitator power, shaft length, impeller diameter and quantity depend on tank geometry, usable volume and drilling fluid properties. Mud guns can improve circulation around the tank bottom and corners.\u003C\u002Fp>\n\u003Cp>For mud preparation, the tank can also integrate a centrifugal pump, venturi jet mixer and mud hopper for bentonite, barite, polymers and other drilling-fluid additives.\u003C\u002Fp>\n\u003Ch3>9. What is the difference between a land-rig mud tank and an offshore mud tank system?\u003C\u002Fh3>\n\u003Cp>A \u003Cstrong>Land Rig Mud Tank System\u003C\u002Fstrong> places strong emphasis on mobility, skid structure, transportation dimensions, lifting points and repeatable field connections because the tanks may move frequently between well locations. An \u003Cstrong>Offshore Mud Tank System\u003C\u002Fstrong> must provide sufficient active and reserve capacity within limited deck space while also addressing lifting, structural load, marine corrosion protection and equipment access.\u003C\u002Fp>\n\u003Cp>SENNUO configures mud tank packages for conventional land rigs, fixed offshore platforms, jack-up rigs, semi-submersibles and drillships according to the installation environment and drilling fluid process.\u003C\u002Fp>\n\u003Ch3>10. Can SENNUO manufacture a Custom or Replacement Drilling Mud Tank?\u003C\u002Fh3>\n\u003Cp>Yes. SENNUO manufactures both \u003Cstrong>Custom Drilling Mud Tanks and Replacement Mud Tanks\u003C\u002Fstrong>. For a new rig or major retrofit, tank capacity, usable volume, dimensions, compartments, agitators, pumps, piping, electrical configuration and solids control interfaces can be engineered around the project layout.\u003C\u002Fp>\n\u003Cp>For replacement work, we use the existing GA drawing, measured dimensions, piping connection positions, equipment mounting points and site photographs as the interface basis. The replacement tank can match the current rig while also incorporating selected upgrades to agitation, piping, pumps or operator access.\u003C\u002Fp>\n\u003Ch3>11. What affects Drilling Mud Tank price?\u003C\u002Fh3>\n\u003Cp>A \u003Cstrong>Drilling Mud Tank price\u003C\u002Fstrong> depends on much more than nominal capacity. Usable working volume, overall dimensions, structural loading, maximum mud density and compartment arrangement all influence fabrication.\u003C\u002Fp>\n\u003Cp>Installed equipment also affects the quotation, including agitators, centrifugal pumps, mud guns, mud hoppers, mixing systems, manifolds, process piping, electrical components, platforms and lifting arrangements. Offshore packages normally require a different structural and corrosion-protection scope from standard land-rig tanks.\u003C\u002Fp>\n\u003Cp>SENNUO therefore prepares quotations against the actual technical specification instead of applying one fixed price per cubic metre.\u003C\u002Fp>\n\u003Ch3>12. What information should I send SENNUO for a Drilling Mud Tank quotation?\u003C\u002Fh3>\n\u003Cp>For an accurate \u003Cstrong>Drilling Mud Tank quotation\u003C\u002Fstrong>, provide the required nominal capacity and usable working volume, active and reserve mud volume, rig type, drilling fluid type, normal and maximum mud density, circulation rate and available installation space. Please also include the required compartments, agitators, mud guns, pumps, piping connections, electrical supply, solids control interfaces and quantity.\u003C\u002Fp>\n\u003Cp>For offshore projects, deck-space and lifting restrictions are important. For replacement tanks, send the existing GA drawing, dimensions and connection positions. For EPC or tender projects, include the technical specification, inspection scope and documentation requirements.\u003C\u002Fp>\n\u003Ch2>Request a Drilling Mud Tank Quote from SENNUO\u003C\u002Fh2>\n\u003Cp>SENNUO manufactures \u003Cstrong>Drilling Mud Tanks, Oilfield Mud Tanks, Skid-Mounted Mud Tanks and Modular Mud Tank Systems\u003C\u002Fstrong> for land and offshore oil and gas drilling rigs.\u003C\u002Fp>\n\u003Cp>For new rig projects, please provide the required active and reserve mud volume, circulation rate, drilling fluid type, available installation space and solids control requirements. For replacement tanks, send the existing GA drawing, overall dimensions, piping connections and equipment layout.\u003C\u002Fp>\n\u003Cp>For EPC, tender or multi-tank projects, please include the technical specification, required quantity, inspection scope and documentation requirements.\u003C\u002Fp>\n\u003Cp>\u003Ca href=\"\u002Fcontact\u002F\">Based on your project information, SENNUO will prepare the appropriate technical configuration and provide a corresponding commercial quotation.\u003C\u002Fa>\u003C\u002Fp>\n\u003Cp>\u003Cstrong>Email: \u003C\u002Fstrong> info@sennuo.com\u003Cbr\u002F>\n\u003Cstrong>Tel\u002FWhatsapp:\u003C\u002Fstrong>  +86 183-6694-0225\u003C\u002Fp>","html","2026-10-17 18:10:31","",{},[8,27,23],{"list":168,"page":5,"size":59,"total":208},[169,177,185,193,201],{"id":170,"typeCode":157,"slug":171,"title":172,"summary":173,"cover":174,"publishTime":175,"isTop":21,"isRecommend":21,"data":176},656,"camion-de-tuberias-enrolladas","Camión de tuberías enrolladas","un Camión de tuberías enrolladas Camión de tuberias matriculadas oil or gas Bien.","\u002Fuploads\u002F1\u002F2026\u002F10\u002Ffa9534f2f83642648f01d9ecc3ba1e16.jpg","2026-10-17 18:10:51",{},{"id":178,"typeCode":157,"slug":179,"title":180,"summary":181,"cover":182,"publishTime":183,"isTop":21,"isRecommend":21,"data":184},655,"api-sucker-rod","API Sucker rod","Descripción de la caña de succión","\u002Fuploads\u002F1\u002F2026\u002F10\u002Feb7d1b2ca8f74ac693bda9e973e5dc0e.png","2026-10-17 18:10:49",{},{"id":186,"typeCode":157,"slug":187,"title":188,"summary":189,"cover":190,"publishTime":191,"isTop":21,"isRecommend":21,"data":192},654,"straight-integral-blade-stabilizer","Straight Integral Blade Stabilizer","SENNUO Straight Integral Blade Stabilizer is a one-piece oilfield drilling stabilizer designed for petroleum drilling, oil and gas well drilling, directional drilling, horizontal drilling and bottom hole assembly control. It helps centralize the drill string, reduce downhole vibration, control well…","\u002Fuploads\u002F1\u002F2026\u002F10\u002F02fb34327f0a4b64bf9015ffc10a3580.png","2026-10-17 18:10:44",{},{"id":194,"typeCode":157,"slug":195,"title":196,"summary":197,"cover":198,"publishTime":199,"isTop":21,"isRecommend":21,"data":200},653,"spiral-integral-blade-stabilizer","Spiral Integral Blade Stabilizer","SENNUO Spiral Integral Blade Stabilizer is a one-piece downhole drilling stabilizer for petroleum drilling, oil and gas well construction, directional wells, horizontal wells and high-deviation drilling programs. It improves BHA stability, supports wellbore trajectory control, reduces drill string…","\u002Fuploads\u002F1\u002F2026\u002F10\u002Fc0fdd51080dd4c78944d0bf1ffa979df.jpg","2026-10-17 18:10:43",{},{"id":202,"typeCode":157,"slug":203,"title":204,"summary":205,"cover":206,"publishTime":199,"isTop":21,"isRecommend":21,"data":207},651,"rotary-kelly-drill-pipe","Rotary Kelly Drill Pipe","SENNUO supplies high-strength Rotary Kelly Drill Pipe for oilfield drilling rigs, petroleum exploration wells, production wells and workover operations. The kelly works as the main drive member in the drill string. It transfers torque from the rotary table through the drill string and helps drive the…","\u002Fuploads\u002F1\u002F2026\u002F10\u002Fc12bad1c59814b88b7fe44807f7cea5c.jpg",{},256]